A3
Sister of the A1, A2 and A4 buildings, the A3 was part of the construction phase 2, from 2011 to 2012.
![](https://www.nemaco.ch/wp-content/uploads/2017/07/detail-1.png)
Square meters
7.644
![](https://www.nemaco.ch/wp-content/uploads/2017/07/detail-2.png)
Status
Delivered
![](https://www.nemaco.ch/wp-content/uploads/2017/11/icon-2.png)
Use
![](https://www.nemaco.ch/wp-content/uploads/2017/08/62crop-SMALL-1.jpg)
![](https://www.nemaco.ch/wp-content/uploads/2017/08/41-SMALL.jpg)
About the building
The equipment includes:
Full fibre optic and cable services
No-break power supply optional
Secured access
2.500m2 per floor
Divisible from 600m2
Direct access from underground parking
Engineered to receive a technical floor
Active ceiling providing heating, cooling and acoustic performance Pre-engineered for sprinkler-installation in basement
4 fully equipped sanitary groups and
connections for 4 pantries per floor level
Heating and cooling according to SIA-norms
Variable Air Volume system (SIA 382/1)
Naturally ventilated parking with CO2 detection
Solar panels for environment friendly heating of water
Heat and smoke detection
![](https://www.nemaco.ch/wp-content/uploads/2018/10/Eysins-Terre-Bonne.jpg)
Project details
Project name
A3
Status
Delivered
Square meters
7.644
Country
Switzerland
Location
Eysins
Start project
2011
Architects
MR&A and
Zimmerman
Tenants
Fresenius,
Webloyalty
Delivered
2012